Unboxing Part 2
Next, let’s take a look at the separately packaged components. According to the label, the first box contains tools, screws and some components.
Here too, all parts are packed separately and perfectly protected from damage during transportation.
The white clip-on profiles will later form the basis for the integrated cable duct.
The tools and assembly materials supplied make a good first impression.
The second small box only contains the flip-up cover for the cable duct.
The hinges also look solid and of high quality.
How the whole thing is connected later is described in the “Assembly” section.
In package 2 of 2 we should now find the electrically adjustable table legs and the motors.
Of course, these individual parts are also perfectly packaged.
Due to the solid table legs, the large desk pad (small box in the background) has been completely forgotten.
So much for the individual components. The assembly will of course also be documented.














































2 Antworten
Kommentar
Lade neue Kommentare
Urgestein
Mitglied
Alle Kommentare lesen unter igor´sLAB Community →